Welcome: APCUPS Power Supply-APCUPS Power Supply (China) Co., Ltd. [Official Website]
Language: Chinese ∷  English

News

UPS installation and commissioning specification

The installation of UPS is mainly to connect the energy storage battery and UPS UPS UPS UPS, connect the mains power, under the state of mains power, the mains power is transformed into the back-end load equipment through the inverter of UPS power host, providing the constant voltage and stable frequency pure energy, under the abnormal state of mains power, the energy storage battery passes through the inverter capacity of UPS power host, and the DC DC inverter is transformed into AC AC inverter to bear the load Reserve capacity, and provide corresponding endurance time for the back-end equipment according to the energy stored in the battery


During the assembly of UPS power supply, it is recommended as follows:


1. When the equipment is in place, unpacking inspection shall be carried out to check whether the equipment is bumped during transportation, the appearance is damaged, and whether the battery is inverted to cause liquid leakage


2. Check that there is no abnormality, and start to assemble the battery. When the battery groups are connected in parallel, use a multimeter to check whether the DC voltage of the battery group is the DC voltage required by the UPS power supply host before connecting the host


(1) Check whether the battery connection is connected wrongly if the DC is not correct (2) carry out the next installation step if there is no abnormality


3. Connect the battery pack with the UPS power supply, connect the input and output of the mains power, connect the air switch at the rear of the UPS power supply, check the voltage of each connection part with the external meter, and start the machine for debugging without any abnormality.

CONTACT US

Contact: APC UPS Power Supply (China) Co., Ltd.

Phone: 13001085780

Tel: 400-881-0312

Email: 197652078@qq.com

Add: Time Network Building, No. 19 Haidian South Road, Haidian District, Beijing

Scan the qr codeClose
the qr code